A battery can be a lot of different things. One form I didn't expect was a brick. Antora Energy found a way to store heat inside of carbon blocks and then storing them while the brick stays at temperatures of 1,500 degrees Celsius or higher. When energy is needed, the system can leverage that heat for industrial uses or convert the heat back to electricity.
The 50,000 SQFT manufacturing facility will be built in North San Jose and should be completed in 2024. The first brick batteries are also expected to be manufactured and delivered to customers in 2024.
Source:
BayAreaINNO
No comments:
Post a Comment