Navigation

Tuesday, July 19, 2016

San Jose Bus Rapid Transit overview video

VTA's first Bus Rapid Transit (BRT) line is getting closer to reality. Despite several delays, the line connecting East San Jose and Downtown should be fully operational in 2017. The blue hybrid "accordian" buses are already being used on the route. These are the nicest buses in the VTA fleet with comfortable seating, free WiFi, and bike racks both inside and outside the bus.

When the BRT line is complete, each stop on the route will get stations similar to Light Rail. These will have real time information for arrival times, local artwork, bright lighting, and 24/7 security cameras.

The other major improvement that BRT will bring besides the stations is faster travel times. This will be accomplished using dedicated bus lands in the median of Alum Rock Avenue as well as transit signal priority (green lights will stay on longer if a bus is present). You also won't have to worry much about catching a specific bus since they are only 10 minutes apart during peak hours.

Have a look at the 3 minute video below for a quick overview of the new system.



No comments:

Post a Comment